Maximo Monitor| Digital twinPIPE-1501 Hydraulics view → - Monitor link -
Laying the transmission main…
Route model: 14 km of DN 1200 ductile iron, 1 km per grid square, elevations ×40. Built from the route profile and the PAM pipe dimensions; not manufacturer CAD. The pipe is drawn above ground for clarity (it is buried 1.5 m).
Measured hydraulic grade (5 transmitters)
Expected grade (Darcy-Weisbach, inlet flow)
Pipe colour = effective roughness (C)